case study
GA Drilling

GA Drilling Secures $44.1 Million to Deploy NexTitan

$24.7m
Fresh money
$19.4m
SAFE conversion
Scroll for more
The Challenge

This investment gives us the capital and momentum to accelerate commercial deployment at scale

In late February 2026, GA Drilling completed a successful field deployment of NexTitan at the NORCE Research facility in Norway, delivering a validated output of 32,000 lbf under real downhole conditions, confirming that NexTitan can drive a drill bit deeper and through formations that have historically made deep drilling uneconomical. This translates directly into wells that geothermal developers could not previously justify on cost, and meaningful reductions in non-productive time for oil and gas operators on complex wells. With that validation now behind them, GA Drilling is advancing on two fronts: active development work with a key deepwater offshore operator, and first commercial drilling engagements with prospective customers.

the solution

Energy Security in a Volatile World: Domestic Geothermal Cannot Wait

Recent escalation in the Middle East, including disruptions to tanker traffic through the Strait of Hormuz, is once again exposing the fragility of global oil and gas supply chains. Geothermal energy is structurally immune to these dynamics, produced locally from heat beneath the earth’s surface, with no exposure to shipping lanes, export restrictions, or foreign policy risk.

The barrier to unlocking that capacity has been drilling cost. NexTitan directly addresses that constraint, making the wells that enable geothermal energy faster, cheaper, and safer to drill.

Our results

A Rare Large-Scale Investment in European Industrial Hard-Tech

At $44.1 million, this round ranks among the largest European funding rounds of 2025 in hardware and industrial technology. This is exceptional result in an environment where most large rounds have focused on software or AI. The IEA projects geothermal could supply up to 15% of global electricity demand by 2050, up from less than 1% today; NexTitan is purpose-built to remove the drilling cost barrier standing between that resource and the grid.

Reaching this point required relentless testing, multiple pivots, and the conviction that deep geothermal would become a priority market before the world was ready for it," said Igor Kocis, Founder of GA Drilling. "This investment validates both the technology and the timing. The energy security conversation happening right now is exactly the context in which NexTitan becomes strategically essential.

2026 is the year NexTitan moves from validated technology to operating asset. Drilling campaigns are already being planned with geothermal developers and oil & gas operators across key markets, and early movers will shape how this technology gets deployed at scale. NexTitan is platform-agnostic and designed to integrate with any developer’s rig and workflow. If you are looking to drill deeper, faster, and at lower cost, GA Drilling is open for business: www.gadrilling.com

Case Studies

Other Case Studies

NexTitan Field Validation Results: Core Functionality Proved in Hard Rock
NexTitan successfully operates in hard rock environments. In February 2026, GA Drilling demonstrated core anchoring and drive capabilities within an actual wellbore at the NORCE Ullrigg facility in Stavanger, Norway.
32 000 lbf
Peak downhole trust
50 m / hr
Walking speed
Proving NexTitan Technology in Houston Field Tests
Field tests in 2023 validated the NexTitan anchoring system’s ability to reliably “walk” and grip while drilling up to 100 ft/hr (31 m/hr).
-35%
Lateral vibrations
Extended
PDC tool lifetime
Partnering with Petrobras to Transform Offshore Drilling
We are unlocking a new model for offshore well construction ...
30%
Lower cost
Increased
Rate of Penetration

Ready to Future-Proof Your Energy?

Want to see how geothermal can deliver reliable, low-carbon power for your operations?